Preparation and upgradation of DPR of Tapovan small hydro power project
Name of work: Preparation and upgradation of existing DPR of Tapovan SHP. DPR was upgraded to 5MW based on new […]
Name of work: Preparation and upgradation of existing DPR of Tapovan SHP. DPR was upgraded to 5MW based on new […]
NAME OF WORK: Design review at Pakyong Airport for slope stabilization to maintain the uphill slope on the western side
NAME OF WORK: Left bank slope stabilization works CLIENT: UJVNL SERVICES: Slope Stabilization work has been done by FEM Analysis
NAME OF WORK: Construction of Bridge cum Barrage, 5 barrages in ODISHA barrages, Kochila, Khalpal, IB-River, Bankataria, Sonu Barrages Barrages)
NAME OF WORK : Detail Studies and updation of existingHydrology, Power Potential studies, Cost validation CLIENT : THDC SERVICES: Water
NAME OF WORK: Slope stabilization and Erosion control CLIENT: Border Road Organisation CONTRACTOR: Spar Geo SALIENT FEATURES: Length 22.1km,
NAME OF WORK: Slope stabilization and Erosion control CLIENT: Border Road Organisation CONTRACTOR– Spar Geo SALIENT FEATURES: Length6.0km & Area
NAME OF WORK: Slope stabilization and Erosion control CLIENT – Border Road Organisation CONTRACTOR-Spar Geo Infra Pvt. Ltd. SALIENT FEATURES: Length
NAME OF WORK: Pre-Bid and Post-Bid Engineering for the Project CLIENT: Ashoka Buildcon Ltd, EPC Contractor SERVICES: Pre-bid services have