
Name of work: Preparation and upgradation of existing DPR of Tapovan SHP. DPR was upgraded to 5MW based on new water series. Power potential, Hydrology, Hydraulic Design, all required DPR drawings and cost analysis.
CLIENT : Uttarakhand Jal Vidyut Nigam UJVNL (Government agency)
Salient Features: Trench weir, 2.7KM long water conductor system, Desilting Basin, Fore bay, Penstock 0.9km,Surface Power House, Tail race channel
Services: : Review and upgradation of 2.5MW to 6 MW, Preparation of 6MW DPR, Cost and financial studies, DPR Drawings.
Project duration : 8 months