NAME OF WORK: Design review at Pakyong Airport for slope stabilization to maintain the uphill slope on the western side of the basic strip at pakyong Airport, Sikkim.
CLIENT : Spar Geo Infra Pvt Ltd.
SALIENT FEATURES: 950 m long and almost 70 m high slope stabilisation work in very complex geology and high permeability.
PROJECT DURATION : Six months
SERVICES:
Review of design and made several changes in design after slope failure.
Regular visit at site to resolve technical issues and supervise the execution of work.