NAME OF WORK:
Design review at Pakyong Airport for slope stabilization to maintain the uphill slope on the western side of the basic strip at pakyong Airport, Sikkim

CLIENT:Spar Geo Infra Pvt Ltd

    PROJECT FEATURES
    950 m long and almost 70 m high slope-stabilisation
    work in very complex geology and high permeability.
    SERVICES:
  • Review of design and made several changes in design after slope failure
  • Regular visit at site to resolve technical issues and supervise the execution of work
PROJECT SCHEDULE:6 months